At the Ramsey High School, the Administrative staff was located throughout the building, in several dated, unwelcoming spaces. They were unable to work together efficiently, and it was difficult for students to interact with several staff when needed. This renovation project carved out a section of the main area of the first floor to create an administration suite. The spaces created are now properly located, efficient in design and allow collaboration amongst the staff and the students. Additionally, the reorganization was designed to create a secure vestibule at the entrance to the high school, improving school safety at the same time.