As part of a variety of recent renovations in Midland Park District, Midland Park High School has renovated its Media Center to reflect how their curriculum has grown and what their current needs have become. The existing 6,000 s.f. media center has been reconfigured to create a new S.G.I. classroom, a flexible presentation area, a computer area and a wide open media center with a lot of space for study tables. All these spaces are brought together with engaging ceiling and floor designs that lead your eyes across the room. The school colors are continuously brought into the space through their furniture, accent walls and frames throughout.