The Dwinelle Annex Renovation for the Disabled Students’ Program will transform a beloved, modest building located in the University of California Berkeley campus’s classical core. The revitalized building will upgrade seismic and life safety performance, and will become a welcoming, inclusive, and accessible new Center for the University’s Disabled Students’ Program (DSP).
The DSP has outgrown its current space and staff are currently dispersed to workspaces in several locations. The 8,800-gross-square-foot renovation project will provide a new, more welcoming home for disabled student services on campus and will consolidate DSP staff, allowing for improved and expanded services for more than 4,000 students.
The academic side, facing north and east, has the potential to display the DSP’s identity and mission. A revitalized entry plaza welcomes students in and is an outdoor extension of the reception lobby. A new passageway connecting the east and west wings on the second floor provides an opportunity to make the building façade more transparent and reveal activity within the building. The creek side courtyard, facing south and west, is where connections to the outdoors and nature can be strengthened. The vision and goals for the Dwinelle Annex renovation were generated through an inclusive and iterative process that included DSP leadership, staff, and the students the program serves as well as Capital Projects and other campus stakeholders. Work sessions with multiple stakeholders, listening sessions, and surveys ensured a robust process that engaged both the individual needs of staff and students and the broader goals of the DSP and the University. Targeting LEED Gold, the estimated project completion is 2024.
LMSA Design Team
William Leddy
Marsha Maytum
Ryan Jang
Gwen Fuertes
Cecily Ng
Cristian Laurent
Project Team
Client: University of California, Berkeley
Architecture/Interiors: LEDDY MAYTUM STACY Architects
Civil: Sherwood Design Engineers
Landscape: In Situ
Structural: Forell | Elsesser
MP Engineering: Buro Happold
Electrical Engineering: The Engineering Enterprise
Envelope: SGH
Cost Estimating: TBD Consultants
Specifications: Stansen
Survey: Bellecci
Renderings
LEDDY MAYTUM STACY Architects