Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Planned Parenthood Macarthur  

Planned Parenthood Macarthur

Oakland, CA, United States

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Fougeron Architecture

Add To Collection Add to Collection

Wavelet House

Add To Collection Add to Collection

Suspension House

Add To Collection Add to Collection

Treasure Island Block C3.4

Add To Collection Add to Collection

Translucence House

Add To Collection Add to Collection

521 Francisco (Office)

Add To Collection Add to Collection

Westchester Colonial

Add To Collection Add to Collection

Spreckels Crossing

Add To Collection Add to Collection

Ryerson Student Housing Competition

Add To Collection Add to Collection

Sunset Branch Library

Add To Collection Add to Collection

Vallejo Street

Add To Collection Add to Collection

City of the Future

Add To Collection Add to Collection

Planned Parenthood Eastmont

Add To Collection Add to Collection

Carter Terrace

Add To Collection Add to Collection

Brava Theater

Add To Collection Add to Collection

West Cliff Drive

Add To Collection Add to Collection

Octavia Court

Add To Collection Add to Collection

Elsie Street

Add To Collection Add to Collection

UC Davis Medical Center VIP Patient Floor

Add To Collection Add to Collection

Laguna Honda Hospital

Add To Collection Add to Collection

Fuel Lounge

Planned Parenthood Macarthur

Oakland, CA, United States

STATUS
Built
YEAR
2003
SIZE
5000 sqft - 10,000 sqft
BUDGET
$1M - 5M
The program called for the complete interior and exterior remodel of a 2 story, 7,000 sq.ft. clinic space for Planned Parenthood. This type of work involves complex programmatic, political, and emotional issues and is always built within strict budgetary constraints. The main intent of the center was to give the clients and the staff an atmosphere of beauty that expresses both warmth and worth and encourages their interaction.

Four Large volumes with dramatically canted walls and skylights flood the interior with natural light. Refracted colored light bounces off the richly painted roofs of the smaller volumes. The changing color and intensity of light throughout the day is a constant reminder of the exterior world beyond. Located right at the front reception desk, the courtyard volume provides a visual oasis for both staff and clients. Its peaceful design with an olive tree, black stones and large white walls is now the heart of the clinic. Sophisticated geometric steel accents play off the softness of frosted glass walls and windows. This thoughtful use of materials evokes the impression of openness and light. Candy jars, filled with colored condoms, are an amusing reminder of the importance of safe sex. Visually interesting and tactile materials such as cork, steel, colored walls, and rice-paper laminates are used throughout the clinic.

Fougeron Architecture provided complete design services including seismic upgrades, programming, interior specifications and furniture selection. We continue to provide ongoing maintainence services for the facility. Construction costs totaled 2.5 M.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team