Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Footbridge across lake "Langer See"  

Footbridge across lake "Langer See"

Böblingen, Germany

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by schlaich bergermann partner

Add To Collection Add to Collection

Williams Crossing Pedestrian Bridge

Add To Collection Add to Collection

Stadium FK Krasnodar

Add To Collection Add to Collection

Tram Stop Europaplatz, Berlin Main Train Station

Add To Collection Add to Collection

Railway Bridge across the Aller River

Add To Collection Add to Collection

Porsche Pavilion Autostadt Wolfsburg

Add To Collection Add to Collection

Arena da Amazônia

Add To Collection Add to Collection

Dongguan Gymnasium

Add To Collection Add to Collection

Brasília National Stadium

Add To Collection Add to Collection

Consol Energy Wingtip Bridge (BoyScouts Bridge)

Footbridge across lake "Langer See"

Böblingen, Germany

STATUS
Built
YEAR
2016
"Flugfeld" (air field) is a new residential and commercial district belonging to the cities Böblingen and Sindelfingen. The artificial lake "Langer See" divides it into two areas. The desired pedestrian and cycle bridge provides not only a functional transport connection, but it also creates a symbolic link.

The design of the load-bearing structure comprises an asymmetric cable-stayed bridge with a harp-shaped array of cables. A special feature is the design of the pylon: both pylon legs are curved, in plan as well as in lateral view. They merge at the tip of the pylon where the cable stays are fixed. The curvature of the pylons is of benefit, as it reduces bending stress. The pylon is constructed of trapezoidal steel box girders. Thanks to the judicious design of the cross-section geometry, the double-curved pylons can be manufactured of flat sheet metal.

The bridge’s superstructure comprises a composite construction of a tub-shaped steel section filled with reinforced concrete, and covered with a slip resistant synthetic layer. These steel sections were installed in three segments. The superstructure is monolithically connected to the bridge abutment on the pylon bank to the south; on the north bank it features a longitudinal expansion bearing.

The slender load bearing structure of the cable-stayed bridge allows an almost unobstructed view across the entire length of the lake. This asymmetric bridge design places emphasis on the south bank and adds thus a striking, but at the same time light counter weight to the densely built area on the north shore.

Client
Zweckverband Flugfeld Böblingen Sindelfingen

Architect
schlaich bergermann partner

Contractor
Karl Köhler GmbH, Besigheim; Stahlbau Urfer GmbH, Remseck

Total length: 50 m
Width of superstructure: 4.50 m
Deck surface: approx. 200 m²
Span: 47 m
Height of superstructure: 230 - 300 mm
Height of pylon:16 m

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team