Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Fariborz Maseeh Hall at Portland State University  

Fariborz Maseeh Hall at Portland State University

Portland, OR, United States

Project Featured on Jan 14, 2022
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Hacker

Add To Collection Add to Collection

Sunshine Canyon

Add To Collection Add to Collection

Home Forward Killingsworth

Add To Collection Add to Collection

First Tech Federal Credit Union Corporate Office

Add To Collection Add to Collection

Salem Public Library Renovation

Add To Collection Add to Collection

Dairy Apartments

Add To Collection Add to Collection

Brainium Studios

Add To Collection Add to Collection

Oregon Episcopal School Athletic Center

Add To Collection Add to Collection

Hellems Arts and Sciences at CU Boulder

Add To Collection Add to Collection

ōkta

Add To Collection Add to Collection

Ledding Library

Add To Collection Add to Collection

High Desert Residence

Add To Collection Add to Collection

District Office

Add To Collection Add to Collection

University of Washington Discovery Hall

Add To Collection Add to Collection

Mendenhall Valley Library

Add To Collection Add to Collection

Moovel Headquarters

Add To Collection Add to Collection

University of Wyoming Visual Arts Facility

Add To Collection Add to Collection

Alaska State Library Archives and Museum

Add To Collection Add to Collection

Basecamp

Add To Collection Add to Collection

Simple Headquarters

Add To Collection Add to Collection

Lakeside at Black Butte Ranch

Fariborz Maseeh Hall at Portland State University

Portland, OR, United States

Project Featured on Jan 14, 2022
Firm
STATUS
Built
YEAR
2020
The task, transform the outdated fortress-like 1960s Neuberger Hall (currently named Fariborz Maseeh Hall) into a modern, interactive, light-filled academic hub. The five-story building was originally built in the Brutalist-style, a common campus aesthetic which reflected the pragmatic and inwardly focused buildings of that era. A half-century later, these buildings represent the antithesis of the open, flexible environments called for today. Evolving this building to meet the current needs focused on three key strategies: 1) re-centering the design to the user—the students, faculty, community members, and others who use the building; 2) prioritizing life-cycle and life safety upgrades to the building as a whole; and 3) engaging with owners, contractors, consultants and subcontractors in collaborative, fine-grained decision-making that preserved as many opportunities as possible to support all Portland State University students.

The design concept repositions the building—which functions as a central student hub with classrooms, lecture halls, student services, and faculty offices—through a series of interventions, renovations, and expansions. The result is an engaging, open, and humane experience. With an emphasis on access to daylight and connections between indoor and outdoor spaces, the 250,000-square-foot building now enhances campus function, while better connecting and responding to its urban setting.

The original building was completed in two phases, 1961 and 1969. The two elements are now joined by a common floor plan, while their distinct exterior appearances are preserved. Through a rigorous programming exercise, the removal of 20,000-square-feet of floor area for the light well reduced only 3,000-square-feet of assignable space, while improving program efficiency and flexibility with the additional floor area at the interior with access to daylight. Exterior facades were upgraded through new curtainwall systems. That increase visibility while enhancing energy performance.

A new central light well brings daylight into the heart of the building, and a more transparent facade provides visual connectivity to the outdoors. The new floor plan now provides students, faculty, and staff with enhanced opportunities for cross-pollination. Improved ground floor program distribution also now provides visual and physical connections between the plaza and park amenity spaces and expands opportunities for more student activity and interaction outside of the classroom. The physical connections are improved through a continuous accessible floor plan with full ADA access and enhanced way finding. Previously closed-in hallways and circulations now have unobstructed line of sight between the building’s eastern and western perimeter.

By renovating Fariborz Maseeh Hall rather than demolishing and rebuilding, the team was able to preserve the embodied carbon of the building and substantially reduce carbon emissions. Together, the combination of replacing all windows with high performing substitutes and the increased daylight into the building, reduces the building’s energy demand by 25% from the CBEC baseline model of buildings of similar size and use.

Hacker Design Team
David Keltner – Design Principal
Jennie Fowler – Interior Design Principal
Nick Hodges – Project Manager
Rashmi Vasavada – Project Architect
Matt Leavitt – Project Architect
Sonia Norskog – Interior Design
Jake Freauff – Design Team
Shawn Glad – Design Team
Marissa Jordan – Design Team
Brendan Hart – Design Team
Alex Palmer – Design Team
Vijayeta Davda – Design Team
Brad Smith – Design Team

Consultant Team
Architecture and Interiors: Hacker
Contractor: Fortis
Landscape: Mayer / REED
Civil Engineer: KPFF
Structural Engineer: ABHT
Mechanical & Plumbing Engineer: PAE
Electrical Engineer: Reyes Engineering
Geotechnical Engineer: GRI
Lighting: Biella Lighting Design
Acoustical Engineer: Stantec
Façade Building Envelope: RDH Building Science
Historic/ SHPO: Architectural Resources Group
Sustainability: Lensa Consulting

Photography
Pete Eckert

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team