Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Community center "Neres" in city Vileyka (reconstruction)  

Community center "Neres" in city Vileyka (reconstruction)

Vileyka, Belarus

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by ASGP Architects

Add To Collection Add to Collection

EUROSPAR

Add To Collection Add to Collection

TRAINING ICE ARENA IN BORISOV

Add To Collection Add to Collection

IBA GROUP OFFICE BLOCK CONCEPT

Add To Collection Add to Collection

Interior of private apartment in Minsk

Add To Collection Add to Collection

IBA Group office building

Community center "Neres" in city Vileyka (reconstruction)

Vileyka, Belarus

STATUS
Concept
SIZE
3000 sqft - 5000 sqft
Designing of the community center “Neres” supposes refurbishment of the existing cold-storage building (built at the beginning of the XX century; since 1939 till 1980-s it was used as a club, cinema theatre) with adding of flanks of new two-story annex. The existing building has a historical value for Vileyka city. That why special attention was paid to the exterior of the multi-purpose center. New volume organically merges with the existing one highlighting the importance and high status of the old building. Design of the annex embraced main distinctive shape elements of the historical centerpiece. Main architectural and engineering solutions allowed the most viable use of the site and accomplishment of quite a big job on development of buffer zone of historical and cultural site (the old building).

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Principal architect