The idea driving the CvLink is to build an electric vehicle, bicycle and hiking path along the existing Whitewater River. The roughly 45 mile path will connect Desert Hot Springs to Palm Spring, continuing through the Coachella Valley to the Salton Sea. For this project we developed conceptual designs and imagery to portray projected use of the Parkway throughout the Coachella Valley. Our design concepts were developed using a mixture of on-site photography and 3d model generation to give a realistic simulation of the project.