Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Cerner Continuous Campus  

Cerner Continuous Campus

Kansas City, KS, United States

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Multistudio

Add To Collection Add to Collection

Cork & Craft

Add To Collection Add to Collection

Indian Creek Library

Add To Collection Add to Collection

NOAA - La Jolla Lab Consolidation Project

Add To Collection Add to Collection

FIU - Century Bank Arena

Add To Collection Add to Collection

Rockhurst University Pedro Arrupe S.J., Hall

Add To Collection Add to Collection

The Crossing at University of Central Missouri

Add To Collection Add to Collection

Kansas Children’s Discovery Center

Add To Collection Add to Collection

ValueAct Capital

Add To Collection Add to Collection

Tulane Yulman Stadium

Add To Collection Add to Collection

James E. Rogers College of Law

Add To Collection Add to Collection

Arizona State Biodesign Institute

Add To Collection Add to Collection

750 Second Street Residences

Cerner Continuous Campus

Kansas City, KS, United States

Type
STATUS
Built
YEAR
2014
The new Continuous Campus signifies Cerner’s commitment to the future of healthcare management. The building is not only an expression of Cerner’s work, but a reflection of the values of a company pioneering the digital age of the medical industry.

The campus consists of two eight-story office towers joined by a collaborative one-story base. Associates benefit from a cafeteria, fitness center, pharmacy and health clinic. Clients benefit from globally connected conference rooms and lounges for training. What makes this facility unique is the crisis event center, where clients can be assisted when systems are at risk during natural disasters. The base features native prairie limestone, while the interior wall surrounding the intimate courtyard is clad in wood reclaimed from the site.

The office towers shelter the courtyard from surrounding sprawl. They are wrapped in a high performance rainscreen system; clad in a warm-brown, textured stainless steel, with a glass-to-wall ratio that varies with the solar orientation. While the window patterning is a nod to the sequencing patterns of DNA, the materiality also speaks to a Midwestern vernacular of metal-clad buildings. The office floors are open and wireless, facilitating collaboration and ushering in a new paradigm for the digital workplace.

Image Credits: Gould Evans

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Associate