The project consists of the construction of 2 buildings. The first is intended for teaching and the second will house offices. Both have contrasting facades: the monolithic and pure facade in stained concrete on the road side of Schiltigheim, contrasts with the three other more sober facades in bakelized wood panels which will perfectly fit into the existing park. On the periphery of the buildings, stainless steel cables will be used to green the façades.
The project is in line with the respect of the business park, which has managed to remain very green, while proposing a new, more contemporary entrance that will initiate the renewal of the park.