Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Black and White Block House  

Black and White Block House

Menlo Park, CA, United States

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Anderson Anderson Architecture

Add To Collection Add to Collection

The Linden Centre Shaxi Community Campus

Add To Collection Add to Collection

Migrant Respite Center

Add To Collection Add to Collection

The Matchstick

Add To Collection Add to Collection

Anekona Project

Add To Collection Add to Collection

Phoenix House

Add To Collection Add to Collection

Sebastopol Barn House

Add To Collection Add to Collection

Energy Positive Relocatable Classroom

Add To Collection Add to Collection

Harvard Yard Childcare Center

Black and White Block House

Menlo Park, CA, United States

STATUS
Built
YEAR
2011
SIZE
1000 sqft - 3000 sqft
BUDGET
$100K - 500K
The Black and White Block House is factory prefabricated in five transportable modules. The house system uses conventional building materials carefully selected for cost-effectiveness, yet provides bright, spacious, indoor/outdoor living spaces on tight, semi-urban infill sites attractive to young families. The design for this very tight site maximizes outdoor living space, with roof top terraces, courtyards and private garden spaces at grade.

The house is available in many variants for various site conditions and individual homeowner requirements, and is available as net-zero energy capable, with high insulation values and options for photovoltaic energy production and other energy conserving and energy producing design components. This house was constructed at a factory in Salem Oregon, complete with all fixtures, appliances, systems and surfaces, trucked to a site in Menlo Park, California, with all modules installed on previously site-built foundations in a six hour period. After this initial day of crane work and joining of the modules, final completion of the house on site includes a limited amount of work joining utility and electrical junctions at module lines, and infilling surface components along module lines. The approach is designed to significantly reduce cost, resource consumption, construction time and complexity for new homeowners, while still providing wide latitude for personalization of the design, and high-quality construction.

The house is constructed on a compact lot in a developed neighborhood, with an existing poor-quality house on the site needing to be demolished. One of the main challenges was that the client requested to have the shortest time possible for onsite construction of the new house, so that once they had moved out of the old house, they could be back in their new home on the same site within just a few months. With the house designed and built in modular prefabrication, it was possible to have the demolition and onsite work shortened to only about 4 months, with the bulk of the house constructed off site in a factory at the same time the site work was underway. This construction approach substantially saves on energy and natural resources, as well as minimizing neighborhood disturbance and reducing the construction finance costs. With most construction systems installed in the factory, a higher quality and predictability of construction costs and schedule is possible, without weather damage and other common limitations of building on site.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team