Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
APEC summit hotel Beijing Sunrise Kempinski Hotel  

APEC summit hotel Beijing Sunrise Kempinski Hotel

Beijing, China

Project of the Day on Jul 28, 2015
Project Featured on Jul 28, 2015
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by HDD

Add To Collection Add to Collection

“Su Shanghai” community art museum

Add To Collection Add to Collection

Mulan Weichang Vistor Centre

Add To Collection Add to Collection

TRANSFORMABLE SMART HOME/Zhang Hai'ao

APEC summit hotel Beijing Sunrise Kempinski Hotel

Beijing, China

Project of the Day on Jul 28, 2015
Project Featured on Jul 28, 2015
Firm
HDD
STATUS
Built
YEAR
2014
SIZE
500,000 sqft - 1,000,000 sqft
BUDGET
$10M - 50M
Concept
The building is based on the concept of traditional Chinese Philosophy of respecting nature. It is located on the bank of Yanqi Lake where the landscape has the tremendous impact to the project. In such a sensitive context, it is the request from the context that people need a building with the quality of both present time and traditional oriental philosophy. The architecture concept is from the idea of oriental sunrise, emphasizing the integration of the nature and the landmark, meanwhile introducing the architecture language for hotel by using 20 vertical warps to show the idea of cooperation and harmony.
Structure design
The main structure system is the combination of the mixed structure system which utilizes concrete-filled tubular column together with steel beams, and the concrete core. The whole building is supported both vertically and horizontally from the concrete core with the steel structure beams inside. Combining the horizontal frames and vertical frames, a lantern shaped structure system not only can fulfill the structure requirement for earthquake and self load bearing, but also creates the sunrise profile of the building.
Sustainability
Within the same floor area, ellipse floor plate building can get extra 25% daylight comparing with normal single tower building. Four-layered Low-E glazing system is used in order to achieve both the lightness as well as decent indoor thermal comfort. The ventilation pipes, being installed inside the vertical bars on the facade, can conduct the fresh air through the perforated aluminum panels. The building has CCHP system that uses natural gas as the main energy source to provide power. The system can recycle the waste heat for hot water and pre-heat the air through heat exchanger, pushing the efficiency to 90%. It also replaces the air conditioner in summer to lower the power demands from the grid system.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Articles