Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Well Coordinated BIM Models with LOD 300 for Construction of Residential-Inn in California  

Well Coordinated BIM Models with LOD 300 for Construction of Residential-Inn in California

CA, United States

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Hitech CADD Services

Add To Collection Add to Collection

Shopping Mall Renovation

Add To Collection Add to Collection

Commercial & Corporate Building Modeling & Design

Add To Collection Add to Collection

3D House Floor Plan Design & Modeling

Add To Collection Add to Collection

Architectural 3d Interior Modeling

Add To Collection Add to Collection

3D Architectural Rendering Building Models

Add To Collection Add to Collection

3D Residential House Model

Add To Collection Add to Collection

Modern Commercial Office interior 3d Rendering

Add To Collection Add to Collection

Architectural 3D Modeling & Rendering

Add To Collection Add to Collection

Fabrication Drawings for Stairlifts Manufacturer

Well Coordinated BIM Models with LOD 300 for Construction of Residential-Inn in California

CA, United States

STATUS
Built
YEAR
2014
The Objective

To create information rich, intelligent BIM with architectural, structural and MEP details for a 6 storied building in California.

Technology/Software Used

Revit, Navisworks

Challenges

1: Missing structural drafts and specifications in the input files from client end.
2: Side cutting fields at the basement were problematic, where the dimensions and survey points did not match

Engineering Solution

1: Information rich, intelligent BIM with LOD 300 for effective material take offs, project coordination, and scheduling was prepared.
2: Inputs received as .PDF files, were successfully converted to BIM to meet architectural and MEP disciplines.
3: Generated missing inputs for structural disciplinethrough engineering assumptions, which were 90% accurate – as confirmed upon receipt of original files at a later stage.
4: Required iterations were done in the 3D Revit model.
5: Analyzed the model for coordination and clash detection for clash mitigation.

Benefits

1: Even after the delays in receiving structural details and input files from the client, the project was successfully executed within the set time frame of 6 weeks.
2: Clash detection helped clients detect and mitigate clashes at an early stage, and save the massive costs of mitigating these clashes at the time of actual construction.
3: The material takes offs, and project scheduling estimates provided, reduced the overall time and cost of construction, and made the process seamless, coordinated and error free.

For More details Visit: www.hitechcaddservices.com/

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team