The district requested proposal from interested parties to take over the existing structure. Our client hired us to design and implement the renovation of the work which included a massive overall interior renovation including opening up the entire side of the structure for new views to the water. Tight, low ceiling and mechanical became the challenge that needed to be overcome. Additional outdoor dining and exterior circulation walks were included in the scope. The structure sits in the middle of the Bay on a man made isaland that leads into the mouth of the tunnel entrance.