Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
VDC  

VDC

Vale de Cambra, Portugal

Project of the Day on May 23, 2020
Project Featured on May 23, 2020
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Summary

Add To Collection Add to Collection

Paradinha - 11 Retreat Cabins in the Woods

Add To Collection Add to Collection

La Biennale di Venezia

Add To Collection Add to Collection

GOMOS #1

VDC

Vale de Cambra, Portugal

Project of the Day on May 23, 2020
Project Featured on May 23, 2020
Firm
STATUS
Built
YEAR
2019
SIZE
10,000 sqft - 25,000 sqft
After the release of a prototype (https://vimeo.com/144377983) and the exhibition in La Biennale di Venezia (http://www.summary.pt/portfolio/la-biennale-di-venezia/), SUMMARY studio unveils the newest project using their prefab and modular building systems.
The requirements for this project were boldly defined from the beginning: the construction should be fast, cost effective and changeable over time, which prompted the studio to use prefabricated elements and to leave parts of the project undefined, assuming the immediacy, flexibility and resources optimization as core themes.
The strategy was clear: a ground floor level for the multi-services program connected with the public space, crowned by the individual habitational units (six cabins with 45m2). Due to the differences between these two programs, it was created an independent access for each one, placing them in different levels and taking advantage of the natural ground’s slope.
The ground floor is shaped by prefabricated slabs and structural panels in the external perimeter. This area was conceived in a very flexible way: it’s possible to add or remove compartments or let the whole floor functioning as a big open space. Thus, the users may adapt the space according to their needs.
The first floor is all composed of Gomos System units. Considering that the maximum building area permitted by law was quite small, the requested empty space was used to separate the housing units. Designed and licensed as a collective housing building, with this feature this project offers the main advantages of single houses: clearly individualized entrances and a complete acoustic separation between the different units.
In the whole building, the structural material - precast concrete - is directly exposed, without any additional finishing, thus reducing the resources, the manpower and the arts involved in the construction process and, consequently, reducing its environmental impact.
This approach has a direct effect in the acceleration of the building process: all its components are fully prepared in factory and quickly assembled in situ, performing at once as structure, insulation and cladding elements.
TECHNICAL DATA:
Team:
Project Leader - Samuel Gonçalves
Architects - Samuel Gonçalves, Inês Rodrigues, João Meira, Gonçalo Vaz de Carvalho
Engineering: FTS, Technical Solutions
Prefabrication and Assembly: Farcimar, Soluções em Pré-Fabricados de Betão
Predominant Material: Reinforced concrete

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team