The new institute building, which is situated directly adjacent to
the 5th construction stage finished in 2005, will complete the ensemble
of brickwork. The extension accommodates the faculties Maritime Technology, Integrated Safety and
Security Management, Bioanalytics and Computer Science.
A university campus stretches out between the two buildings. Lavish,
open staircases invite as much to linger in the courtyard as to enter
the institute. In form and materiality the new building subordinates
itself to the existing building. Minor new interpretations such as the
colour of the bricks emphasise the autonomy as well as the sculptural
character of the complex as a whole.