Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Technology Building Leuven  

Technology Building Leuven

49, Herestraat, Leuven, Belgium

Project Featured on Apr 11, 2017
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Gortemaker Algra Feenstra architects

Add To Collection Add to Collection

Nemocnica Bory Hospital Bratislava

Add To Collection Add to Collection

Hospital Maas and Kempen

Add To Collection Add to Collection

Radiotherapy centre HMC

Add To Collection Add to Collection

St Antonius Hospital Utrecht

Add To Collection Add to Collection

Dutch Telecom Company

Add To Collection Add to Collection

Train Control Centre Utrecht

Add To Collection Add to Collection

Óscar Romerocollege

Add To Collection Add to Collection

Parking Garage Cliniques Universitaires Saint-Luc

Technology Building Leuven

49, Herestraat, Leuven, Belgium

Project Featured on Apr 11, 2017
STATUS
Built
YEAR
2014
SIZE
25,000 sqft - 100,000 sqft
BUDGET
$5M - 10M
The new building on the edge of the university campus is not merely a functional building one has to accept, and certainly not an unavoidable intrusion either. Indeed, it enhances the visual appeal of the quarter and accommodates, on some 6000 square metres floor area, the quarter’s energy and data centre. For functional reasons the three-storey building is all but opaque. There are numerous ventilation openings but few places that could be glazed, such as the two staircases on either of the narrow sides and an area on the first floor.

From the first floor upwards, perimeter walls are closed with externally insulated precast concrete components. The thermally insulated panels are finished with black acrylic lining. In front of those, an aluminium subframe supports 600 millimetre deep fibre cement vanes. The secondary façade serves as an additional layer of thermal protection and a shield from rainwater and sunlight. Just as importantly though, and given its form and colour, it is the material that lends the building’s exterior its attractive appearance. The vanes in front of the closed exterior walls have been mounted at a pitch of 30 degrees from the vertical. In frontal view and from a distance the façades therefore appear opaque, displaying a distinct horizontal structure. Viewed at an angle, the vanes seem to converge towards a distant vanishing point. In close-up view the appearance
changes yet again as the gaps between the vanes towards the top of the building become seemingly wider.
Vanes in front of glazed wall sections have a 60 degree pitch, proffering yet another façade pattern that changes during a 24 hour cycle: during the day it presents more of a dark background, but when lit from behind these surfaces become quite bright.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team