The site has many advantages by its geographical situation, surrounded by the Selangeran river and the Baltic sea.The program requests an indoor connection at the existing building «Kulturmagasinet», with which the new arts center will form a new cultural complex. The ground floor is organized as a movement winding around the existing building.From this base two masses lift up. The project is developed like an articulation around the Kulturmagasinet, and is directly connected at its existing atrium. The main circulation of the project ensures a fluid connection between the existing building and the project. This organization allows to absorb the complexity of the program, placing spaces requiring a better accessibility at the ground floor level.The facades of the theatre building are made out of concrete. They represent caracters from Swedish tales. The facades have two different finishes - concrete at exterior and porcelain at interior sides, reflective or glittering according to lights.