Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Sports complex. Moscow region.  

Sports complex. Moscow region.

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Sports complex. Moscow region.

Firm
Sports complex. Moscow region. Lytkarino Volkushinsky bat.An urban setting.Site design 3ga area, is located in the immediate vicinity of Lytkarino, (Moscow Region).Object Design - Sports Complex.At the heart of the urban concept is the organization of the transport connection, by connecting the street and May Day Park.The concept of a sports complex proposes to create a visual connection to the external environment, to ensure a comfortable time forwarding for a long period of time. To this end, at the site are planned: a hotel, park and beach areas.The organization provides parking area at 100 m / prigostinichny seats and parking for 30 cars / seats.Space - planning solutionStructural plan is rectangular, which includes three main parts: an indoor sports hall, lobby and an outdoor beach sports.The indoor sports hall were designed two sports fields with stands for 300 spectators. For more efficient use of space platforms are connected. Gymnasium has the ability to transform by raising and lowering the curtain separating, dividing the room sports hall into two parts.The outdoor area, focused on the water, provides the podium at 2,000.Organization of space to create a lobby entrance, connecting the beach area with an area of ​​the main entrance. Architectural composition hall built on the principle of step inclines. By lowering the levels of disclosure forms kind to the environment.The main volume of the building: smoothly flowing forms, as it were coming out of the relief with accessible roof, the use of the slope under the seating area, with the opening at the quarry and park.Constructive solution. Nasal-cellular structure. Structural system involves steel mesh hyperboloid shell with diamond bearing resh ѐ mended. Steel frame takes care of all loads in accordance with the regulations (SP 16.13330.2011g., SP 20.13330.2011g., (Loads and effects))Material: steel, concrete.Technical and economic indicators.Built-up area - 10 200 m2.Building volume - 138 000 m3.Park at 100 m / seats.Wardrobe - 500/chel.Rostrum (covered area) - 300/chel.Rostrum (open area) - 2000/chel.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Architect