The building plan is determined by the objective of clear spatial arrangement and taking advantage of the valuable location on the slope. The block of the hall – creating a compact form embedded in the open space – was partly open from the slope side. The main architectural accent is glazing on the entire height of the climbing wall and the main hall, together with representative stairs leading to the first floor. In this way some interaction is created between the internal and exterior spaces of the hall, which enables people to observe things happening inside. Simultaneously, the edges of the openings, coated in gold colour, formally separate the light interior of the hall from the exterior wall, which is covered with anthracite metal sheet.
The sports field size 44 by 24 metres takes most of the building’s surface area. Beside it there is a cloak-room facility section and entrance to the room with the climbing wall, and an extendable part of the audience space (600 seats). The fixed section of the audience space (400 seats) is located on the first floor of the building with access from the hall on the ground floor.
Architecture: Maćków Pracownia Projektowa: Zbigniew Maćków (Chief Architect),
Bartłomiej Witwicki (Leading Architect), Agata Kowalczyk, Eliasz Matuła, Magdalena Paprotna, Zuzanna Wojtasiak
Structure: GP Konstruktor
Investor: Gmina Bytom
General Contractor: Skanska
Installations: Segesta (Sanitation), Santem (Ventilation), Candela (Electrical Installations)
Building area: 3285 m2
Usable area: 4644 m2
Total area: 5726 m2
Capacity: 45149 m3
Competition: 2007
Project: 2007
Implementation: 2010
Photographs: Tomasz Zakrzewski