This Project involves the master plan
layout of the sport park Simbirskiy as well as the design of the core
buildings. The
master plan indicates a recommended basic set up of the facility and
anticipates its future development.
- Track,
(length 3,700 m, FIA grade 2 with Shortcuts)
- Main
Grandstand (10 000 Seats)
- Pit
Building,
- Racecontrol
and Administration Building
- Road
Safety Training Center [RSTC] and Seminar Building
- Off
Road Park
- Indoor-Kart
- Master layout Business Park
Pit building, Racecontrol, Administration Building
& main grandstand
Each structure and building on the site
represents its specific uses. Every single item is elementary in order to
properly operate the track. Therefore the goal is to create an architectural
form which obviously serves the function. The cladding fronts display the
business card of the sport park Simbirskiy. The specific materials used in
detail support the effect. Printed glasses and polycarbonate boards provide the
necessary theme related visual presentation. Darker materials such as fair
faced concrete support that effect with a restrained appearance of the solid
structures. By using similar material and color concepts at all buildings, an
affiliation is developed without losing the individuality of each building. The
simple, but elegant forms and a high-contrast color concept display an
unmistakable modern identity to the sport park Simbirskiy.