TECHNICAL DESCRIPTION
Residential building is designed according to the terms of reference and applicable regulations and
standards for this type of object.
LOCATION AND PURPOSE OF THE FACILITY:
The location of the building is land of 24.00 x 25.00 m. Cadastral parcels included in the plan:
Whole plot 50/7; 5/4; 12/7; 5/7; 5/2; 2/16; 2/2; 2/17; 2/18: 2/19; 2/20; 2/21: 2/22; 6/2; 6/3; 6/4; 7; Parts of plot 50/4; 50/3;
50/10; 22/4; 22/15; 12/8; 12/13; 12/15; 5/6; 5/5; 2/1; 2771/1; 50/5;
Municipalities Dorćol in Belgrade. The shape of the building lot is irregular, 7,45ha surface, parallel to the Danube Quay Street.
Facilities in the immediate surroundings were built in different periods and without clear stylistic
characteristics. After the industrial purposes, located on the border of its own grounds by
lateral neighbors and drawn toward the street.
At a given parcel is planned after the demolition of the existing thermal power plant construction of a new industrial center on the ground floor and first floor with four production lines of solar panels on the second floor of the museum, a third construction of an educational center. The newly constructed building would have the same characteristics when it comes to exterior appearance and would have an area of 3,805.29 m².
Environment, functional units:
Ground Floor + 1:
1. Admission, entrance for employees, the entrance to the educational center, entrance to the museum
2. The corridors with reception desk
3. Manufacturing Space
4. 5. Storage of raw materials
6. The stairwell
7. Pantry finished products
8. Space home employees
second floor :
1. Exhibition Space
2. The stairwell
3. Office of the curator
4. Office Assistants
5. Toilet for employees and visitors
Third floor:
1. Open Space Education Center
2. Auditorium
3. Classroom 1
4. Classroom 2
5. Toilet for employees and visitors
6. The stairwell
7. The Office of the Director of the educational center
SPATIAL ORGANIZATION AND DESIGN:
Gabarit projected object according to the Act on urban conditions set in
framework construction lines. The construction line of the ground floor of the facility was drawn to him 3:00
compared to the regulatory line the street Danube quay, which is defined in the Graphics View
situation. Altitude control is defined by flooring P + 5 + Ps flat impassable roof.
When designing the facility requirements are fully met. The building has five floors above ground.
In terms of design the building was designed as a complex whose form is
substractions formed, and simple, but the specific composition that retains the shape and appearance of old power plants. Property tends not to charge, but certainly by the end defines the space in a way that previously built structures in this environment requires. Facades are in the design and in the materialization resolved so that the windows as much connected with the natural environment.
The projected material of the facade is brick.
The building is designed as a simple form developed rectangular base total
the external dimensions of 52.00 x 74.00 m.
In order to align the object with the lie of the land, the surrounding built-up areas and
parts of the world, it is necessary to take into account the orientation of the object relative to the parameters
specific locations. Bearing in mind that the building was designed as a facility high marks
energy efficiency, it is desirable that the primary parameter for the orientation of the object to be
of the world, ie the movement of the sun.
FUNCTION:
Functionally, the building in question as a designated industrial-museum and educational facility storey structure P + 5 + Ps, dedicated to manufacturing and education.
The ground floor to the first floor is planned for production facilities of solar panels, the second floor is
designed for the museum, and the third floor has the function of an educational center.
The entrance to the building is from the street Danube quay. Vertical communication is provided in the form of
Stairs and elevators that provides a link between all floors, which are considered functional
area, which is naturally lit and ventilated.
Ground floor area is 3280.18 m², second floor has a total area of 3105.73 m², a third
the first floor has an area of 1988.38 sq.
CONSTRUCTION:
Constructive conception of the object based on reinforced concrete columns
resting on reinforced concrete base plate as the primary, and reinforced concrete
beams as secondary structural elements. The foundations are made of reinforced concrete
amended additives for waterproofing and all the necessary waterproofing layers.
The floor joists between the floors of a reinforced concrete slab. constructive
the walls of the staircase, only stairs are also made of reinforced concrete.
FOUNDATIONS:
The fundamental structure of the building consists of reinforced concrete foundation strips.
ENVIRONMENTALLY FRIENDLY MATERIALS
The construction of the building preferred building material fabricated on environmental
grounds and natural ingredients. In addition to ceramic products which are used in a large
extent, some of the most common materials are wood and natural stone that have significantly
Place in ecological construction, especially in the finishing of living space.
MINIMIZE ENERGY CONSUMPTION
Energy technical requirements in the construction of residential facilities in recent years have significantly
increased. System construction with brick to achieve the lowest possible energy cost.
In addition, it is necessary to carry out quality protection and thermal insulation material. Okay
isolated building consumes less energy for heating in winter and cooling for years. loss
heat and energy consumption per m2 is directly reflected both in the energy and
the longer lifetime of the building. These facts have been stipulated by that when
design and construction in particular take into account the choice of materials and their
quality setting in order to effectively save energy.
By installing solar panels on the flat roof of the building, as well as the entire length of the crane, which stretches from the house all the way to the river, 110m in length, it is a huge energy savings during the summer months.
Research / History:
Thermal Power Plant "Power and Light" was built in the period from 1930 to 1932 and was shut down in 1970. A complete reconstruction of Dorcol marina in the exclusive residential and business center, announced in 2007. However, the announced reconstruction has not begun.
The complex (7,45ha) there are objects old pumping station - the main facility at sea (in the marina) and the object on the ground (which make the boiler Hala, Mechanic room and Command Šalterska sala - basically 2 800 m2), each functional connected steel bridge construction. Sam pumping station was out of service, as well as building on the ground.
The airspace is dominated by construction crane that transcends space marine to half of the pool, mounted on rails in the border complex Stare exchanges, in which capacity he was. The total length of 110 m, at a height (calculated from the floor) approximately 13 m, and height steel framed around 6 m. Kran facilities and pumping stations in the marina, as well as significant objects of industrial architecture, in accordance with the terms of the Institute for protection, according to the detailed regulation plan in 2005 is retained.
Ruling mayor in 2006, the Israeli investor "Engel Marina Dorćol" Ltd. was awarded the lease for 99 years 2.5 acres of buildable land, to this part of the coast got your fortress, but also residential and business complex of 76,000 square meters. Belgrade Land Development Public Agency has launched a lawsuit against the lessee 'Engel Marina Dorćol "1.3 billion of outstanding liabilities. In the eight previous years, a very attractive land, not even a brick
set. Even the fence is removed from the site. Certain companies GBES appeared in public as the new owner "Engel Marina Dorćol" and denied assertions that the former representative was not obtained building permits.
Management tenant land "Engel Marina Dorćol" disappeared without a trace. On this site, as can be read in the media, there is no one who could talk about the fate of the project.