Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Renovation of an industrial building in the Catholic Church  

Renovation of an industrial building in the Catholic Church

Brest, Belarus

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Haarchitect

Add To Collection Add to Collection

Reception for medical Center Novamed

Add To Collection Add to Collection

Beauty Hair Salon Inn Studio

Add To Collection Add to Collection

Cafe Kali laska

Add To Collection Add to Collection

Dental Deko hall

Add To Collection Add to Collection

City Gym Sporting club in Brest

Add To Collection Add to Collection

Kangol shop in Moscow

Add To Collection Add to Collection

BSTU facade reconstruction

Add To Collection Add to Collection

Provence in Brest

Add To Collection Add to Collection

Eco school

Add To Collection Add to Collection

Stairs

Add To Collection Add to Collection

Entry sign in the Republic of Belarus and Brest

Add To Collection Add to Collection

Brest Aquatics Centre by Haarchitect

Add To Collection Add to Collection

Brest Aquatics Centre

Add To Collection Add to Collection

Soft Box - relax and comunity zone in office

Add To Collection Add to Collection

Brest City - new cultural center.

Add To Collection Add to Collection

Archi Sky

Renovation of an industrial building in the Catholic Church

Brest, Belarus

Type
YEAR
2013
48h18 m administrative building located in the city of Brest . The facades are made of hinged panels , column spacing 6 , 3m. Reasons for reconstruction :
1. Transferring industrial complex outside the city limits and the need to give a new feature adjacent residential industrial area .
2 . Physical condition of the building ( adjacency nodes overlap and columns came into constructive disrepair ) .
3 . Obsolescence of the facade , structure planning , neighborhood.
4 . The need for more cultural and serving the district
5 . Cold indoors due to the changing norms of heat engineering buildings.
The variant part of the reconstruction of ABA in modern Catholic cathedral . The project foresees the accomplishment of adjoining territory belfry , new coatings , landscaping , parking.
The building of the Catholic Cathedral provides additional space on the second floor for the wedding , choirs on the second floor space at the entrance to the communication functions and expectations. On the basis of the cathedral will act Catholic Sunday school with the teachers' classrooms and the library.
Central core ABA replaced a large space without columns in the center. Old wall dismantled and erected new ligation with metal columns with a diameter of 15 cm from the load-bearing caisson ceiling and at the same time invisible from the street, which creates the illusion of hovering close- overlap in the air.
Instead of the old windows installed new , with individual composition.
In coffered ceilings established skylight creates additional lighting in the area of ​​the altar. Lantern is with careful calculation that a holiday from December 25 in the morning until 12:00 and light round spot will move from the corner of the wall to the altar creating sacred experiences of the congregation .
Central symbol of the altar is a modern pastiche of the cross in bulk composition highlighted below.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Architect, rendering, compositing, postproduction

Articles