Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Radiotherapy centre HMC  

Radiotherapy centre HMC

1, Burgemeester Banninglaan, Leidschendam, Netherlands

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Gortemaker Algra Feenstra architects

Add To Collection Add to Collection

Nemocnica Bory Hospital Bratislava

Add To Collection Add to Collection

Hospital Maas and Kempen

Add To Collection Add to Collection

Technology Building Leuven

Add To Collection Add to Collection

St Antonius Hospital Utrecht

Add To Collection Add to Collection

Dutch Telecom Company

Add To Collection Add to Collection

Train Control Centre Utrecht

Add To Collection Add to Collection

Óscar Romerocollege

Add To Collection Add to Collection

Parking Garage Cliniques Universitaires Saint-Luc

Radiotherapy centre HMC

1, Burgemeester Banninglaan, Leidschendam, Netherlands

STATUS
Built
YEAR
2017
SIZE
25,000 sqft - 100,000 sqft
BUDGET
$10M - 50M
Radiotherapy centre West is an initiative of the Haaglanden Medical Centre, location Antoniushove. The oncological care of several regional cooperating hospitals is concentrated within the new build radiotherapy centre. Next tot that the building full fills the wish from patients and staff for an environment with plenty of day light and views to the outside.

A normal design solution for an irradiation chamber is to put it into the ground. This done due the heavy use of concrete, radiation hazards and the sensitivity of the equipment. This design solution leads often to a lack of daylight and view to the outside for patient and staff.

In this new building for Haaglanden MC, six irradiation chambers are placed above ground. By leaving space between the chambers and the roof, the building is flooded with light and views to the outside. The places for rest are placed on the edges of the building with always a view to a green area around the building.
The vertical transportation nodes are also accentuated with the use of roof lights. Inner walls are transparent to not obstruct the sunlight from entering the hallways. To secure the privacy in some cases translucent signing is placed on top of the glazing.

On top of the building a sedum roof is realised, which can be seen from the adjacent bed tower of the hospital but also from the inside of the radiotherapy centre on the office level. The roof supports cooling in the summer and holds water during heavy rain. Another sustainable measure is the adaptive lighting control applied throughout the building.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Articles