The main problems to be solved in this project were:
- Maximum use of the space proposed by task (the presence of two existing volumes with a half-floor height difference of the roof marks),
- Creation of a convenient and comfortable workspace,
- A special style of the building, creating an image which would emphasize activities and innovativeness of the company located in the building.
Entrance to the building is at the corner formed by the two main facades of the building by the ramp located along the main facade. Because of two volumes with a half-floor height difference of the roof on the site, the first march of the internal staircase leads to the 1.65 m. in the space located above the lower volume. Here, as the above are located toilets for visitors, toilets for staff and room for cleaning equipment. Also at the level of 1.65 is located technical room, where engineering equipment can be located. The next level after mark of 1.65 march of stairs leads to the first floor of the building where the office of homebuilding company is located. On the second floor is the office of the company that sells furniture. A half-floor height difference have allows to place bathrooms of both companies one above the other, as well as toilets and a place for the security at the level of 1.65. An internal staircase located adjacent the wall of the building is illuminated by the lantern, designed on the roof of the building. Also,
over the larger superstructured volume is designed terrace on the level of the ground floor. There is an outer staircase on it from the second floor of the room relaxing and eating. Along the perimeter of the building glazed balconies are designed, due to brackets, stylistically reminiscent of a log laying.