The project of blocked dwelling house was made in 2008 for a small settlement located east of the city of Sochi, on the site, between the streets Transport and Shahumyan and is designed to take in the short and long-term lease. This project is a remastering of the project performed in 1984.
The building consists of a 3-storey duplex for two families. Due to the high groundwater level building is designed without a basement. On the ground floor there is an entrance area with wardrobe, active recreation area, which includes a room with a pool changing room, shower and WC and garage for one car with storage room. The staircase connects all three floors is located at the common inner wall of the duplex. On the 2nd floor there is a kitchen with a bathroom, dining room and living room, settled in one volume. On the third floor is the master bedroom with bathroom and office also solved in one volume. It adjoins the bedroom balcony, covered with a large canopy removal, preventing, because of the hot climate, direct sunlight into the room. From the balcony of the vertical ladder leads to the visor, which is also a small outdoor terrace. Also on the ground floor outdoor terrace adjacents to the pool.
Stylistically, the building is decided in the marked industrial style. In terms of the building is divided into three zones, two residential zone and vertical communications, enclosed in a semicircular glassed volume. Figuratively all three zones as if connected by a common element in the form of a shaft, the ends of which are glazed stained glass windows, is the main source of natural illumination of premises of the building.
The building is made of modern materials.