Keep Exploring Architizer by Creating a Free Account or Logging in.
This feature is for industry professionals.
To unlock it, signup and then join or add your company.
To unlock this feature,
signup and then submit your professional details.
The 67 metre long footbridge was completed in September 2000 at a cost of £ 530,000. The bridge provides a unifying link for pupils over a busy road between the original school and the 1960’s school building to the north. The footbridge curves past the trees in the school grounds and climbs to rise above the traffic. The footbridge opens at its centre into an elevated viewing gallery with seats adjacent to oriel windows.The design demonstrates an innovative response to a complex brief and challenging budget by minimising material cost and disruption to the operation of the school during construction. The footbridge has a simple steel balustrade and deck structure supported on steel columns and is protected from the weather by a light weight fabric covering stretched over a series of steel hoops. The components were pre-fabricated off site to reduce cost, ensure quality and facilitate convenient erection during the summer holiday.The bridge acts to inspire and enrich the pupils during this important stage of their development and create a bold identity promoting the newly unified schoolAwards: Structural Steel , BCIA Awards, Civic Trust Commendation, Special Mention, Prime Minister’s Public Building Award.