The project for a terminal renovation and expansion was an opportunity to transform an existing facility into an airport that can meet the needs of post 9/11 security protocols.The renovation included 5,000 SF of existing space along with the addition of three new entrance vestibules and a 300' long drop-off canopy, updating both the functionality and the aesthetic of the Airport. The second level features a new holdroom accessed through a two-lane security checkpoint, as well as two airlane gates with passenger boarding bridges.The project contained several parking lot and traffic flow improvements, including a new entry monument and signage. The project also featured extensive phasing so that continuous Airport operations could be maintained.