Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Palácio de Justiça de Gouveia  

Palácio de Justiça de Gouveia

Gouveia, Portugal

Project of the Day on Sep 13, 2015
Project Featured on Sep 13, 2015
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Barbosa & Guimarães Architects

Add To Collection Add to Collection

Casa José Prata Building Rehabilitation

Add To Collection Add to Collection

Povoação Municipal Pool's Complex

Add To Collection Add to Collection

Lamego Multi-Purpose Center

Add To Collection Add to Collection

Fonte Da Luz

Add To Collection Add to Collection

Soares Basto Secondary School

Add To Collection Add to Collection

Vodafone Headquarters Building

Palácio de Justiça de Gouveia

Gouveia, Portugal

Project of the Day on Sep 13, 2015
Project Featured on Sep 13, 2015
STATUS
Built
YEAR
2010
Gouveia, door for entry to the Serra da Estrela, is going to be served by new Law Courts. The land set aside for construction is located between the public gardens, at the end of the Rampa do Monte do Calvário, replacing an existing building. The project takes advantage of the demolition of the existing building, which occupied the whole of the plot, to design a new Plaza, with a scale and dignity to receive the Law Courts.In dialogue with the granite walls that define its surroundings, the Plaza takes on the form of a bottling of stone, upon which the Law Courts rest.The building, set on four pillars, ensures transparency and connection between the two gardens that delimit it to the north and the south.The dignity and symbolism that a building like the Law Courts should always have is achieved at the cost of the monolithic and singular character that the volume of white concrete acquires, above all in the expression of its compact elevations, with empty spaces deeply excavated, as if suspended over the Plaza.The lobby/foyer crosses longitudinally the entirety of the building, communicating directly with the garden to the north, establishing a relationship of closeness with the tops of the existing trees through a horizontal empty space.In the volume, the courtroom stands out, with a set of vertical skylights that subtly light the whole space.The registrars services, which operate independently, are installed in the filled part of the building, open to an interior patio which communicates directly with the north garden.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team