With this project we complete the extension started 4 years ago with the upper floor.
The customer needed to expand their space by occupying the old warehouses that had been disused for some time on the floor below.
The work that we went on to design consisted in recovering the spaces for offices use without altering the existing load-bearing structures but rethinking the spaces for the new offices in a more organic way.
The needs were to have small conference rooms for meetings with more privacy, an "open space" operating space, a conference room for 50 people, a medical center. Furthermore, to complete the independence of the floor itself, 2 bathroom blocks and related employee changing rooms and various service areas for all the plant engineering have been added.
The choices of materials have all been oriented towards the maximum acoustic/climatic and working comfort of the people.
The materials chosen, in addition to having top-level technical performance, are all natural. Wood, felt, washable water-based paints, breathable plasters, ergonomic furniture, LED lighting system and home automation management.