Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Newteam Office Building BMBT  

Newteam Office Building BMBT

Zone Industrielle Bombicht, Niederanven, Luxembourg

Project Featured on Oct 29, 2013
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by STDM architects & urban planners

Add To Collection Add to Collection

Multimodal Hub Luxexpo

Add To Collection Add to Collection

Pfaffenthal Lift

Add To Collection Add to Collection

SCHLSS_Two houses in L-Hesperange

Add To Collection Add to Collection

BRDL_House with Patio in L-Bridel

Add To Collection Add to Collection

NYC - Gansevoort Street Project

Add To Collection Add to Collection

House LFTMT in Louftémont

Add To Collection Add to Collection

House PPLB Luxembourg

Add To Collection Add to Collection

Housing JFBR

Add To Collection Add to Collection

House SPNR in Bridel

Add To Collection Add to Collection

House FLSTA in Luxembourg

Add To Collection Add to Collection

House KRTMRG in Dalheim

Add To Collection Add to Collection

Housing Project SNHBM / Grünewald

Add To Collection Add to Collection

Baulücken 2010 Luxembourg/2

Add To Collection Add to Collection

Baulücken 2010 Luxembourg /1

Add To Collection Add to Collection

Kirchberg LuxExpo and Train Station District

Newteam Office Building BMBT

Zone Industrielle Bombicht, Niederanven, Luxembourg

Project Featured on Oct 29, 2013
Type
YEAR
2006
SIZE
100,000 sqft - 300,000 sqft
BUREAU NEWTEAM

Renovation and reconversion of an industrial hall

Niederanven

project / building permit 2004-05
construction 2005-06

Contractor :
Newteam s.à r.l., InCA s.à r.l.

Architects:
STEINMETZ DE MEYER architectes urbanistes
njoy interior design studio
Architects / contributors:
Nathalie Jacoby, Jil Streitz, Arnaud De Meyer, Gérald Deplus, Kristina Zöbel

copyrights: STDM, Njoy, Christof Weber
Budget : 1.500.000,- Euro
Surface : 2100 m2
Volume : 14889 m3


This project responds to the specific request of a consulting engineer’s company to transform a standard industrial hall, a former carpentry, into their new main office that can accommodate 80 employees.

On a parcel of a featureless industrial zone in a context without interest, the challenge was to create a quality workplace giving a strong image of the company, which all employees can identify themselves with, and this with budget constraints, involving specific measures

The facade shows a repetition of 2 types of prefabricated elements:
- Window frames with integrated blinds consist of a large double glazed fixed sight and an opaque opening for ventilation.
- Wood frame freestanding modules comprising insulation and a rough Douglas pine cladding on its back and shelves inside. These elements are set independently from the existing metal structures that have been raised to clear a maximum usable space.

This principle allows to combine the budgets for the facades and some of the furniture, but also to improve the energy efficiency thanks to the selected ratio windows / sandwich elements, sparing this way air-conditioning.

A courtyard has been created in the centre of the old hall, around which are the cafeteria, the executive secretary with the main meeting room and working areas for designers on two levels. Individual offices or small groups of engineers and technicians, as well as smaller meeting rooms are arranged along the exterior facades. The interior fit out and new floor structures depict unexpectedly raw building techniques that are the everyday life of these construction and civil engineers. The lightness of the central walkways and open spaces encourage maximal diffusion of natural lighting provided by the patio.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

architect