Nerva, north
of the province of Huelva, in the Tinto River basin, was born to host the
mining. The construction of a building of its type (theater/cinema) is the most
important event for the whole city. What is even more in the case of Nerva,
with a long tradition in using this kind of cultural space, becoming to leading
collective activities. The transformation of an area of the city abandoned promoted
by the construction of a public building, carries with it the spatial and
social transformation of the city and relationships.
The
building is thought from a design capable of providing a maximum level of use:
combining various activities and makes them compatible, collect and separate
the various uses, offering a multidisciplinary container.
The
building is organized from the ground floor basically on two levels. Ground
floor with entrances (Main Park), hall and support spaces (dressing rooms,
technical area (pit stage and orchestra pit); first floor, lobby, main hall,
stage, rehearsal room and an extension (second floor) where you can access the
amphitheater of the room. Spaces are placed up technical and audio-video booth,
lighting galleries and service spaces and facilities comb. They have three
bays, one central and two smaller side absorbing longitudinal movements, and a
lower height bay on the west side townhouse, which is the gallery of the park
and the relationship with him. The tense final volume arises from the
interpretation and management of the proposed program, accusing the various
heights of the spaces, withdrawal on the ground floor of the proposed porch and
no longitudinal symmetry denotes the position of the gallery, orienting the
building.