Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
MRT Putrajaya Line Phase 1  

MRT Putrajaya Line Phase 1

Kuala Lumpur, Malaysia

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by ONG&ONG

Add To Collection Add to Collection

Parochial House

Add To Collection Add to Collection

St Joseph’s Church

Add To Collection Add to Collection

MRT Putrajaya Line Phase 1

Add To Collection Add to Collection

Monterey Residences

Add To Collection Add to Collection

Cuenca House

Add To Collection Add to Collection

Bedok Public Library

Add To Collection Add to Collection

BECA-House

Add To Collection Add to Collection

Artyzen Singapore

Add To Collection Add to Collection

Restaurant Fiz

Add To Collection Add to Collection

New Teck Park

Add To Collection Add to Collection

Greenfield Residence

Add To Collection Add to Collection

Cerrado Suites

Add To Collection Add to Collection

105DW-House

Add To Collection Add to Collection

80ADR-House

Add To Collection Add to Collection

37FC-House

Add To Collection Add to Collection

30JLP-House

Add To Collection Add to Collection

25PBL-House

Add To Collection Add to Collection

11CK-House

Add To Collection Add to Collection

9JW-House

Add To Collection Add to Collection

2VPG-House

MRT Putrajaya Line Phase 1

Kuala Lumpur, Malaysia

Firm
STATUS
Built
YEAR
2023
Contributing to Malaysia’s public transportation infrastructure, ONG&ONG was tasked with executing the Line-wide elevated station blueprint for the design concept, detailed design as well as design implementation of the Putrajaya Line. For this purpose, ONG&ONG conceptualised a design that emphasises best practices of Malaysian and International Standards, to ensure the complete functionality of the system, as well as being a unified whole with the built and soft environment.

The nine stations launched in Phase One are Damansara Damai, Sri Damansara Barat, Sri Damansara Sentral, Sri Damansara Timur, Metro Prima, Kepong Baru, Jinjang, Sri Delima, and Kampung Batu.

The new line will serve areas currently without direct access to existing and proposed lines, such as Serdang and Putrajaya, and is also expected to relieve pressure on the KLCC area and of course, the KL road network overall.

Design Brief

This MRT system provides access for all citizens including those with special needs. For the stations, a range of generic concept designs consistent with the overall objectives were developed. A standardised entrance design was developed encompassing a range of types that offer flexibility to suit different site constraints whilst maintaining a common design language and a clear and recognisable identity.

In terms of local vernacular as well as building styles, the MRT Putrajaya Line stations adopt household motifs, drawing influence from the traditional Malay house. One component is the “Serambi”, which is the receiving porch of the Malaysian home before one enters the main hall or living spaces. As a transitional element transcends from traditional Malaysian timber construction vernacular, hence this particular element leads into the idea of a ‘Serambi’ theme facade and concourse level.
One of the fundamental objectives of the station planning and design is the provision of convenient, safe, and efficient passenger circulation with clear, direct routes, minimum horizontal and vertical travel distances within alignment constraints, minimised changes of direction, and optimised visibility and passenger orientation. The development of the designs for stations satisfies the overall objectives and key design principles for a modern, world-class transit system.
All materials are selected from a range which are appropriate to mass transit systems. The selection of finishes considers the economy, durability, maintenance, resistance to vandalism and corrosion, aesthetics, and availability of materials in the local context. Where applicable, materials were sourced locally such as the rain screens and louvers that mimic the materiality and motifs found in the traditional Malay house.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team