the project to set up meeting rooms is the first step in the architectural renovation of pa headquarter. the idea of a technological implementation that can hide all the systems and equipment is experimented in the multipurpose meeting rooms dedicated to employers, customers and suppliers. the spaces have to be flexible and able to board meetings, movies, case histories’ screening and interviews. a soundproof and silk-screened glass acts as a separation between the two rooms, without loosing the perception of a wider spatiality, linked to the structural span. the classrooms may become a space for studying, reading and professional updating too.
the table, by the recessed digital and electrical junction box and the lights by upwards and/or downwards spot lighting allow the use of any tablet or portable device, both wifi connected to a roller screen (which also acts as a shielding solar system), both directly on the table.
the chairs with rotules allow movements around all table’s perimeter. the structure of the table is made of steel and ensures a continuous all around hanged top. the pivot doors are built on measures like all the furniture, profiles and windows and guarantee lightness and soundproofing, even without any kind of key. within the offices’ space the bow window brings out as an easily identifiable but non-invasive volume. a lifting projector is embedded in the false ceiling. the rack, below the window, contains all the controls and the junction boxes for videoconference or skype call.