This global corporate headquarters houses Engineering, Software, IT, Tech Support, Sales and corporate leadership for multiple locations throughout the world.
Openness and natural light were the key directions given by MiTek CEO to ACI Boland’s design team. Over seventy-five percent of all offices are “in-board” with all glass walls facing the exterior. The exterior glass has solar sensored fabric window coverings to mitigate any glare. Low-E, high-visibility, high performance glass was chosen for the curtainwall segments as well as the “punched” windows in the masonry portions of the building’s exterior. Bicycle racks, showers and locker rooms, on-site walking trail and dedicated LEV and CP parking spaces will contribute to the points required for a LEED Certification.