KOSB Industrial Vocational High School: Its design was started in 2010 with the protocol signed between KOSB and Kayseri National Education Directorate in order to provide qualified personnel support for the Kayseri Organized Industrial Zone.
There are 29 classrooms, 6 workshops, a cafeteria, a library, laboratories, a pocket cinema and other sub-units in the project designed within the scope of the needs program. The high school building, which has a 6130 m² living area, consists of a ground floor, 2 normal floors and a penthouse, a total of 4 floors. There is a dining hall on the roof floor. The total construction area is 38,414.28 m².
The design was shaped in order to create a healthier environment for the students in line with the feasibility studies prepared during the design process. Courtyards have been created where students can relax and spend time during the workshops.
The High School building of the Industrial Vocational High School Complex, which consists of a high school building, a gym and a dormitory building, was designed in 2010-2011, its implementation started and its construction was completed in 2013. While the construction of the dormitory is still ongoing, the sports hall is planned to be built in the coming years.