Located at 4000ft elevation in the remote Hawaiian Homelands this challenging site had no power, or water, and is accessed over a bumpy 4wd dirt road .The project showcased our panel construction method focusing the wall assembly in the workshop in order to reduce time onsite. The house was assembled in a 2 week period right at the onset of the cover lockdown in March 2020.