The design challenge for our office was the construction addition to a pre-existing building from 1940, with the primary objective being the functional and aesthetic integration of the new building components, as well as the harmonization of the new building structure with the rugged geomorphology of the land.
Based on these parameters, the final proposal is developed across three levels, with each level featuring an outdoor relaxation space. In conclusion, the purity of the structure is enhanced by the use of stone materials and a pristine white color palette.