Intelligent Revit BIM Model with LOD 500 for Saudi Based Company  

Intelligent Revit BIM Model with LOD 500 for Saudi Based Company

Saudi Arabia

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Hitech CADD Services

Add To Collection Add to Collection

Shopping Mall Renovation

Add To Collection Add to Collection

Commercial & Corporate Building Modeling & Design

Add To Collection Add to Collection

3D House Floor Plan Design & Modeling

Add To Collection Add to Collection

Architectural 3d Interior Modeling

Add To Collection Add to Collection

3D Architectural Rendering Building Models

Add To Collection Add to Collection

3D Residential House Model

Add To Collection Add to Collection

Modern Commercial Office interior 3d Rendering

Add To Collection Add to Collection

Architectural 3D Modeling & Rendering

Add To Collection Add to Collection

Fabrication Drawings for Stairlifts Manufacturer

Intelligent Revit BIM Model with LOD 500 for Saudi Based Company

Saudi Arabia

STATUS
Built
YEAR
2013
Project Objective

Intelligent MEP BIM Modeling with LOD 500 for University hospital building project as per AIA standards.

Technology/Software Used

Autodesk Revit Architecture 2013, Autodesk Revit Structure 2013, Autodesk Revit MEP 2013, Autodesk NavisWorks 2013


The client, a reputed company from Saudi Arabia, contacted Hi-Tech for a University Hospital building project. The construction work had already started and the client wanted BIM with LOD500, as per AIA standards, across MEP, architectural and structural disciplines.

This construction documentation was intended to not only make the process of construction efficient but also to enable a smooth and streamlined facility management once the building gets occupied.

Challenges:

1: The construction work had already started, BIM adoption at a later stage during the project is challenging

2: The turnaround time was another challenge, and detailed BIM had to be developed and delivered within an almost unreasonable deadline

3: Additionally, the team also had to understand and deliver BIM with Level of detail 500, as per the AIA standards

4: The building information model had to be developed to support the client right through the facility management phase, and details for all disciplines including MEP, architecture and structure had to be integrated.

5: The project was taken up when the construction had already started and interdisciplinary clash detection and construction simulation along with material take off, scheduling etc was quite a challenge.

Engineering Solution:

1: A team of professionals with extensive experience of handling BIM projects and specialization across various disciplines was dedicated for the project.

2: Both on shore and offshore support was provided to enable faster collaboration and hence meet the set deadlines.
In addition to the BIM geometry, text documentation and as-built BIM information needed for O&M and FM purposes was also documented.

3: All the interdisciplinary clashes were detected to allow clients mitigate risks and reduce rework.

4: Accurate material takes offs and construction scheduling was provided, a comprehensive approach was followed to implement higher collaboration in the project.

Benefits:

1: As the project delivery was on time and the most suitable to carry out construction flawlessly, the client – main contractor for this project, finished construction on time as per tender deadline and as desired.

2: Liabilities, risks due to clashes and hence rework during the construction phase reduced, in addition to reduction in wastage of materials, manpower and time. Hence client saved money on the project and thus enjoyed better ROI.

Get more project details at: http://goo.gl/HTQLT0