Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Illinois Army National Guard Readiness Center  

Illinois Army National Guard Readiness Center

Galesburg, IL, United States

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Bailey Edward

Add To Collection Add to Collection

Champaign County Plaza

Add To Collection Add to Collection

Malcolm X West Campus

Add To Collection Add to Collection

Altgeld Hall

Add To Collection Add to Collection

Illinois State Fairgrounds Coliseum

Add To Collection Add to Collection

Schiller Place

Add To Collection Add to Collection

Readiness Center Addition and Renovation

Add To Collection Add to Collection

Surgical Innovation and Training Laboratory

Add To Collection Add to Collection

Barbara Vick Early Learning Branch

Add To Collection Add to Collection

Baker Demonstration School Master Plan

Add To Collection Add to Collection

UIC Richard Daley Library Addition Master Plan

Add To Collection Add to Collection

Ismaili Jamatkhana House of Worship Glenview

Add To Collection Add to Collection

Peoples Bank

Illinois Army National Guard Readiness Center

Galesburg, IL, United States

YEAR
2007
The Illinois National Guard needed a Readiness Center to replace two dated facilities. Bailey Edward’s design solution creatively utilizes substantial materials such as metal and brick to provide an architectural character that conveys the strength and trust that defines the National Guard’s mission, while achieving a modern, high-tech military facility. The design was featured in metalmag for its utilization of metal to express a strong visual presence. Extensive government guidelines regarding ceiling heights, roof types, and security measures were methodically incorporated into the design solution. SPiRiT Gold Standard rating, the military’s Sustainable Project Rating Tool prior to USGBC LEED, was achieved and long-term operating cost goals were met. An elaborate sustainability plan involved louvered sunscreens to reduce passive solar heat gain and bio-swales that remove 80% of suspended solids during storm water management.
This project challenged Bailey Edward to not only meet project goals with an attractive design, but also to respond to extensive government security requirements. A methodical approach ensured an innovative response to both Federal and State guidelines, and allowed for ingenuity in the creation of an aesthetically pleasing solution. For example, the design leverages a curved roof line and higher parapet walls to minimize massing differences caused by Federal guidelines restricting room sizes and ceiling heights, and State preferences for non-flat roofs.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Architect
Architect