TAGLINE
re-imagining community healthcare as an expression of our humanity
THE SITE
the site sits in an existing building; on a prominent corner property in the heart of joburg this design is the first of three phases in the construction of a community-oriented day hospital which provides space which is sensorily thoughtful and kind
THE BRIEF
democratic access to natural light and ventilation; a re-considered waiting room;
a re-imagined doctors room;
efficiency in service of the patient
THE IDEA
the originating idea was to break down the notion of a traditional doctor’s room;
this meant ignoring the conventions of consulting spaces, of waiting rooms, and of corridors
how could we re-conceive of healthcare architecture and its furniture to echo the passion of this medical team? if the client was to practise value-based healthcare, should the architecture not speak to the same values?
MATERIALS
the building utilises the simplest set of materials
the majority of the internal walls are built from rough stock brick which is bagged and painted white
any walls which are temporary - and planned for removal in the next phase of the project - are constructed out of gypsum board local pine ply is used in the construction of all furniture
the material palette is deliberately straightforward, so that the architecture moves to the background
allowing for plants, and art, and people to move to the fore
PROGRAMME
the floor plan is designed to accommodate consulting rooms, waiting spaces, a reception, bathrooms, and service spaces as an added level of complexity, the current plan is configured in such a manner
as to allow for the conversion into two theatre spaces in phase 03 of the project
SOLUTIONS
the initial design which had been drawn up by architects specialising in the healthcare sector
had called for an additional 25% of area to be built onto the existing building
- this would have comfortably doubled the budget of the build -
by critically examining how doctors conduct consultations and how patients move through the spaces, we were able to produce efficient spaces which packed the same programmatic requirements into the existing floor plan without any additional new build
CLIENTS
in the case of the rosebank health village, the doctors were clear that the architectural client must be thought of as two distinct entities the primary clients are patients and local community members coming to the village to access primary healthcare
the secondary clients are the epione health village staff
the group of doctors were adamant that the architecture should serve the best interests of the patient
in their words, epione health village is here to re-imagine primary healthcare
in an inclusive, value-based, accessible, dignified and sustainable way for an african patient
epione is a true partnership between clinicians and operators
to invest in-, build, own and operate highly efficient, patient-centered healthcare facilities across africa
HOW IS THE BUILDING UNIQUE?
this building is a careful and direct response to what is required for a comfortable patient experience
by designing the consulting rooms and all of the furniture, we were able to reduce the size of a consulting room by almost 25%
included in this thinking was a re-consideration of what a waiting room could be
instead of a conventional waiting room
- where uncomfortable proximity to other patients is the norm -
we provided waiting nooks outside each doctor’s room
this design move not only increases the building’s spatial efficiency,
but also allows patients a degree of privacy if they arrive early for an appointment
in the words of the head physician,
“it is worth noting specifically that Covid, as an airborne infectious disease, has forever changed the way we will think of the doctors waiting area the consideration of natural ventilation, light and enforced yet stylish social distancing is invaluable”
SUSTAINABILITY
the primary factor in creating a sustainable building is to maximise the value of a square metre of building
by designing efficient - and effective - space, we negate the need to build any new additions
this is a huge factor - not only in the environmental sustainability of the build - but also in the economic sustainability of the client
in producing these tight spaces, however, there is absolutely no sacrifice in the quality of light and ventilation provided for each space
CLOSING THOUGHT
the biggest problem with healthcare is that it should be the highest expression of our humanity, but instead it is cold light, incessant bleeps, and the bitter smell of antiseptics,
when it should be sunlight and running water and petrichor