Due to the new circumstances
,and the fact that the controlled obsolescence cycles were reaching its own
terms ( fact that allows to recycle ourselves at the same tame) we are changing
the actual bar to fit the new conditions. Following
the previous experiences after 8 years from the Hotel inauguration and
after a deep reflection about the
impermanency, we decided to design this new bar with a system much closer to
stage building ,by assembling prefabricated modules which allow an easier installation (just in time), as
well as its own un-installation and
reconfiguration. We were asked to do an
"english" bar, this is our contemporary interpretation of it.