Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Head offices of the Telecommunications Market Commission, CMT  

Head offices of the Telecommunications Market Commission, CMT

Project Featured on Jun 12, 2014
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Batlle i Roig Arquitectes

Add To Collection Add to Collection

Tanatorio Sant Joan Despí

Add To Collection Add to Collection

Escola Bressol Nursery

Add To Collection Add to Collection

Telefónica Corporate University

Add To Collection Add to Collection

CTRV

Head offices of the Telecommunications Market Commission, CMT

Project Featured on Jun 12, 2014
Type
STATUS
Built
YEAR
2010
SIZE
100,000 sqft - 300,000 sqft
Architects: Enric Batlle, Joan Roig, architects Collaborators: Goretti Guillén, Meritxell Moyá, Helena Salvadó, architects, G3 Arquitectura, STATIC, Gerardo Rodríguez, engineer, structure, PGI Grup SL, installations Design date: 2008 Construction date: 2010 Client: Grupo Castellví Contractor: DRAGADOS Façade: MOYSER Installations: AXIMA, IMEMSA, Area: 12,000 m2Like the INTERFACE building, the building for the Telecommunications Market Commission (CMT) is situated in the 22@ district. In this case, the building forms part of a complex, 22@ Business Park, developed by Grupo Castellví and containing a large business complex of over 41,000 m2 of offices and hotels, delimited by four streets: Bolivia, Ciutat de Granada, Sancho d’Àvila and Badajoz. Also set in this sector is one of the factories of the old Can Tiana textile mill, built in 1906 to a project by Guiteras and listed in the Special Protection Plan for the Industrial Heritage of Poblenou.The CMT building stands on a long, narrow site that presents its main façade to Carrer Bolivia and is delimited to either side by a passage. One of the old Can Tiana factory buildings stands at the centre of the site, and the project sets out to recover and incorporate it into the CMT’s functional programme. The main volume comprises three basement floors for car parking and eleven floors above grade with offices and services. The ground floor, providing the function of access and entrance, connects with the old mill building, the original structure of which is conserved as an auditorium with capacity for 330 persons, a large meeting room and services for CMT employees. The roof of the mill was adapted for use and connects with the first floor.The main volume, containing the offices, is organized around a central nucleus of entrances and services, and the workstations are laid out around it, making full use of the spatial freedom enjoyed by a building that opens out on all four sides. This allowed us to explore a volumetric formalization that sets the building apart from its surroundings, highlighting its lengthwise asymmetry and increasing its height in relation to the axis of the street. This formal freedom produces a singular form, faceting the faces of the building and moulding it as a unique, recognisable piece that finds its reason for being in an innovative relation between exterior and interior. The variation and superposition of exterior spaces and workspaces serve to direct the volume towards the old factory and establish a subtle, utilitarian relation. The distant presence of the sea and a south-facing orientation determine the correct position of the terraces.The decision to bring a unitary treatment to the building’s outer appearance led us to protect its façade using a horizontal slat system throughout its volume that continues over the old factory, connecting the two. The slats serve to cover the upper terraces and installations, and form an awning at the ground floor entrance.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Photographer