Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Haley VI, British Antarctic Survey  

Haley VI, British Antarctic Survey

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Haley VI, British Antarctic Survey

Firm
Inspired by Brunel's concept of modular construction for military hospitals in the Crimea, our design proposes a series of pre-fabricated shipping containers, bolted together during the10-12 week Antarctic summer. This form is wrapped in a "puffer jacket" of structural fabric pillows, which streamline the building aerodynamically and provide a first line of defence against the harsh climate.

Four pairs of articulated hydraulic legs and feet allow stepping above drifting snow and generate the forward walking movement necessary to relocate the buildings, in order to counteract the gradual flow of the Ice Shelf. The form of the building, and its ground clearance have been deliberately engineered to manage snow drifting.

The structure is planned with a flexible interior, fitted out with custom-designed pods as bedrooms, bathrooms, a bar, gym, offices and plant rooms, all bolted in place on site. The pods are laid out around communal spaces, which allow plenty of room and separation, for recreation, work and sleep.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Architect

Team