Renovation plan of 2 family house for in Setagaya Tokyo.
When the parents build a home, second floor to allow as a child household dwelling,
Bathroom, toilet has been built already, kitchen had been to ensure that can be installed.
The opportunity to get married, because the son households to live on the second floor,
Because we wanted to reflect the preferences of their ease of use and, was the renovation part of the minimum required.
The partial minimum required, living, dining, kitchen, bedroom.
Kitchen, because the layout would be determined on the pipe,
I studied the layout of the bedroom and the living and dining.
By using not walled bedroom, to partition sliding doors, it becomes integral living, dining,
I have to feel widely as one space.
The wall facing the outside, because it was board insulation with, and parquet finish and finish plastering,
The inner wall, was a mortar finish that makes the RC structure.