Building D, the first built building is part of a larger master plan for 81,000 sqm logistic compound comprising of 4 industrial warehouses. The immense building's façade was designed with low cost prefab materials such as: insulated steel panels, multiwall polycarbonate panels and precast concrete slabs. The building encloses automatic storage shelves on the north, distribution area on the south and offices on the west side. All the programs are enclosed in one continuous façade with randomly cut light slots.