Pod have completed a number of projects in Gatwick Airport and one appearance as retail design consultants reviewing both north and south terminals.
Pod Architects developed the design and detail for the new entrance to Gatwick South Terminal and it was successfully opened on time in spring 2012. The development consists of a new entrance with a spectacular canopy, new routes to the Terminal and additional public facilities. The development was constructed whilst the terminal was operational and was completed within a period of 18 months.