Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Flameworks Creative Arts Facility  

Flameworks Creative Arts Facility

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by Research + Design

Add To Collection Add to Collection

Devonport Park Bandstand

Add To Collection Add to Collection

Acre Place

Add To Collection Add to Collection

Pennycomequick

Add To Collection Add to Collection

House in Cornwall

Add To Collection Add to Collection

New Street

Flameworks Creative Arts Facility

Type
SIZE
1,000,000 +
BUDGET
$100K - 500K
 The design of a two storey extension and refurbishment for Plymouths Creative Artists Facility. Flameworks is the largest artist led workspace facility in Devon and Cornwall and houses nearly 24 artists including ceramicists, jewellers, metalworkers, painters and sculptors.The design includes new artists studios and workshop spaces based at the rear of building overlooking Stonehouse creek, and a single storey entrance and office extension in the front of the building.
Hand-crafted metal and timber elements produced by the artists and craftspeople on site are fixed onto a low cost backdrop of pre fabricated industrial cladding. These elements make up the new openings in the construction that admit light, air, and people to the facility  - everytime a visitor or client walks through a door, or opens a window they come in direct contact with these handcrafted elements and a bit more aware of the craft and skill of the artists that made them.A skylit corridor divides the existing building from the two storey extension adjacent to the creek. Visitors can peer down into the existing workshops or enter the new studio spaces with a high level glazed clerestorey. The ceilings of the upper studios are angled to accept the reflections of the sunlight off the water below. Ventilation to the studios is provided through Siberian Larch ventilation hatches theat punctuate the external cladding.
The project incorporates a prefabricated structure and prefabricated and insulated cladding panels in order to minimize the price of the materials and installation time on site. A large portion of the project is onsite construction. All timber cladding and joinery is from FSC accredited sources and procured from renewable stock. Passive solar elements aid heating in the winter and cooling is achieved through a coordinated cross ventilation system.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team