Keep Exploring Architizer by Creating a Free Account or Logging in.

This feature is for industry professionals.  To unlock it, signup and then join or add your company. To unlock this feature,  signup and then submit your professional details.

Membership is Free.

LinkedIn Facebook Google
or
Already a Member? Sign in.
Add To Collection Add to Collection
Factory Renovation  

Factory Renovation

Milan, Italy

View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection
View Original View Original
Add To Collection Add to Collection

Other Projects by UPA Italia by Paolo Lettieri Architects

Add To Collection Add to Collection

OSA HOSPITAL

Add To Collection Add to Collection

SHAAMS HOSPITAL

Add To Collection Add to Collection

TRAUMA AND REHABILITATION HOSPITAL

Add To Collection Add to Collection

ST. JOSEPH SCHOOL

Add To Collection Add to Collection

Ajman Hospital Expansion

Add To Collection Add to Collection

CARDIAC CENTER AT AL QASSIMI

Add To Collection Add to Collection

SHATT AL ARAB HOSPITAL

Add To Collection Add to Collection

MUSIC SCHOOL AT LADIES CLUB

Add To Collection Add to Collection

ST. MARY SCHOOL

Add To Collection Add to Collection

Chalet Housing Project

Add To Collection Add to Collection

MELAK 200 BED GENERAL HOSPITAL

Add To Collection Add to Collection

AMERICAN SPECIALTY HOSPITAL

Add To Collection Add to Collection

School for 3000 Students

Add To Collection Add to Collection

HIGH SCHOOL C3 – CAMPUS

Add To Collection Add to Collection

OSA Hospital

Add To Collection Add to Collection

ISTISU THERMAL SPA RESORT

Add To Collection Add to Collection

Moon Flower Hospital

Add To Collection Add to Collection

Al Lesaily School

Add To Collection Add to Collection

Tamreem Clinic

Add To Collection Add to Collection

Desert Box Centre

Factory Renovation

Milan, Italy

STATUS
Built
YEAR
2009
In the old industrial east area of Milano Lambrate, close to Rubattino area, client request to develop the refurbishment of an chemical factory build in last century: the industrial sheds where built between 1920 and 1970 and the main building on the street, the office building, was built at the end of the ‘sixties. The project maintain the original volumetric distribution and give to the compound a new and fresh skin. The main façade is totally redesigned with the addition of geometrical bow windows. The international courtyard of sheds is intentionally refurbished to preserve the original environment of the compound.

Product Spec Sheet

Were your products used?
Join as a manufacturer to add your products.

Collaborating Firms

Team

Principal Architect