Honor Award, AIA Utah, 2005New 74,000 SF building with wet and digital studios, classroom, art gallery, and a 120-seat auditorium. The building is located in a prominent entry corridor to the main campus. The project included building humidification for permanent and temporary collection, display and storage, food service, student commons, art book and periodical library, sculpture garden, and digital and distance learning labs. The building requires a sophisticated HVAC system to balance considerable air quality and toxic material handling needs.